DDSL logoDDSL banner
Electronic & Electrical Engineers  

Quick Quotes - Test House Facility

Standard 4 hour test consists of but not limited to:

Test House
  • Run set, Check for leaks etc
  • Run set for 15 mins off load
  • Run set for 30 mins @ 25% load
  • Run set for 30 mins @ 50% load
  • Run set for 30 mins @ 75% load
  • Run set for 30 mins @ 100% load
  • Run set for 30 mins @ 110% load
  • Reduce load over 15 mins to zero
  • 0-6 customers in attendance

Either select from our standard range below or enter the 100% engine consumption in litres per hour and click on calculate button. Price quoted does not included transportation to and from Tendering nor load bank hire as appropriate. Should you require any additional information please do not hesitate to contact us.

Calculator
[l/hour]